Foundation Construction (Complete) [EX1-SIG]

Foundation Construction (Complete) [EX1-SIG]

After clicking on ‘Construction> Substructure Construction> Foundation Construction' in the navigation treeview, follow the steps to define the Foundation Construction. You can use the collapsed documentation page below for more information on the explanations of each parameter.

1

Click three-dots icon on Stage cell and select a Construction Stage as SubstrConstStage.

 

 

2

As a result of these operations, an issue will appear on the OpenBrIM screen. This does not necessarily mean that any operation was done incorrectly. The issue will be resolved when the foundation are define in the next step.

 

3

4

Click three-dots on the cell of the Foundation and pick all the foundations.

5

Keep the Self Weight Factor as default.

6

Proceed to the next step to verify the model.

The completed foundation construction is illustrated below. Please verify that you have the same model on your end by examining each view provided here. For more information on how to perform visual checks, refer to the quick tips.

 

Related content

Superstructure Attachment Construction [EX1-SIG]
Superstructure Attachment Construction [EX1-SIG]
More like this
Bearing Construction [EX1-SIG]
Bearing Construction [EX1-SIG]
More like this
Pier Column Construction [EX1-SIG]
Pier Column Construction [EX1-SIG]
More like this
Pier Cap/Bent Construction (Complete) [EX1-SIG]
Pier Cap/Bent Construction (Complete) [EX1-SIG]
Read with this
Foundation Construction (Complete) [EX1-STG]
Foundation Construction (Complete) [EX1-STG]
More like this
Pile Construction [EX1-SIG]
Pile Construction [EX1-SIG]
Read with this