Construction Stage [EX1-PIG]

Construction Stage [EX1-PIG]

After each construction stage, the finite element analysis produces results that can be utilized to ensure structural compliance with codes. To create the stages correctly, users must understand the underlying logic. At the start of the stage construction analysis, all structural elements are in an unconstructed state.

Please follow the instructions provided below to construction stages.

1

Navigate to Loading > Construction Stage

2

Begin by defining a construction stage and then enter the preceding stage for that construction stage.

3

Ensure that the "Prior Stage" cell is “Null” as the first stage of the construction process does not have a preceding stage.

4

To assign the data in the "Construction Method" and "Filter by load type cells" click on the three dot-icon and select the appropriate option from the combobox.

5

Enter the data as follows for 1st Stage:

Name: BridgeConst

Prior Stage: NULL

Construction Method: None

Load Type: Dead

Active: Yes

6

Please repeat steps 2 through 5 to define all of the construction stages in the project.

 

7

In Staged Construction Analysis, when joints are activated they normally enter at the location that was initially given to them. Joints sometimes need to become active in a location relative to the deformed structure of the model, rather than in an exact position known ahead of time.

The construction method option of construction stages specifies how to place a joint relative to the deformed location of other joints.

 

In Precast I Girder Bridges, deck formwork deforms and follows girder displacements. Therefore deck nodes should be constructed by shifting the node down to match the translational displacement of the girders nodes. This can be achieved with the Construction Method = Equal option of construction stages.

 


1

Navigate to Construction Stage under Loading on the tree view.

2

Copy Stage, Time Dependent and AASHTO N-3N from model inputs and paste into OpenBrIM.

 


Construction Stage

Construction Stage

Stage

Time Dependent

AASHTO N-3N

BridgeConst NULL None Dead Yes GirderErection BridgeConst None Dead Yes SIPFormConst GirderErection None Dead Yes DeckConstPour SIPFormConst None Dead Yes DeckConstHard DeckConstPour Equal Change Yes BarrierConst DeckConstHard None Imposed Dead Yes FutureWearingStage BarrierConst None Wearing Surface Yes LiveLoadStage FutureWearingStage None Live (Vehicular + Impact) Yes WindonStructureStage FutureWearingStage None Wind on Structure Yes TUExpStage FutureWearingStage None Temperature Yes TUContStage FutureWearingStage None Temperature Yes BrakingStage FutureWearingStage None Braking Yes CentrifugalStage FutureWearingStage None Centrifugal Yes WindonLLStage FutureWearingStage None Wind on Live Yes CollisionStage FutureWearingStage None Vehicular Collision Yes
BridgeConst 0.0000 NA 72.0000 80.0000 Include Include Include Include Include GirderErection 0.0000 NA 72.0000 80.0000 Include Include Include Include Include SIPFormConst 0.0000 NA 72.0000 80.0000 Include Include Include Include Include DeckConstPour 0.0000 NA 72.0000 80.0000 Include Include Include Include Include DeckConstHard 0.0000 NA 72.0000 80.0000 Include Include Include Include Include BarrierConst 0.0000 NA 72.0000 80.0000 Include Include Include Include Include FutureWearingStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include LiveLoadStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include WindonStructureStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include TUExpStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include TUContStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include BrakingStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include CentrifugalStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include WindonLLStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include CollisionStage 0.0000 NA 72.0000 80.0000 Include Include Include Include Include
BridgeConst NULL NA GirderErection NULL NA SIPFormConst NULL NA DeckConstPour NULL NA DeckConstHard NULL NA BarrierConst NULL NA FutureWearingStage NULL NA LiveLoadStage NULL NA WindonStructureStage NULL NA TUExpStage NULL NA TUContStage NULL NA BrakingStage NULL NA CentrifugalStage NULL NA WindonLLStage NULL NA CollisionStage NULL NA

Related content

Deck Construction [EX1-PIG]
Deck Construction [EX1-PIG]
More like this
Girder Construction [EX1-PIG]
Girder Construction [EX1-PIG]
More like this
Custom Diaphragm [EX1-PIG]
Custom Diaphragm [EX1-PIG]
Read with this
Construction Stage [EX1-STG]
Construction Stage [EX1-STG]
More like this
Bearing Construction [EX1-PIG]
Bearing Construction [EX1-PIG]
Read with this
Construction Stage [SIG]
Construction Stage [SIG]
More like this