/
Top Reinforcements [EX2]
Top Reinforcements [EX2]
Please follow the instructions provided below to Top Reinforcements design of slab
Table 1: Top Reinforcements
|
|
| |
| |
| |
It's "merged" because it intersects 2 different reinforcements. The spacing of the 59th line rebar should be increased | |
Before Merge
After Merge
| |
|
|
|
|
| |
| |
| |
CAD view of before drawing slab reinforcement
CAD view of after drawing slab reinforcement
|
The “Top Reinforcement” part is completed in this step.
You can proceed to the “Bottom Reinforcement” section.
, multiple selections available,
Related content
Slab Design [EX2*]
Slab Design [EX2*]
More like this
Top Slab Reinforcements
Top Slab Reinforcements
More like this
Bottom Slab Reinforcements
Bottom Slab Reinforcements
More like this
Bottom Reinforcement [EX2]
Bottom Reinforcement [EX2]
More like this
Designing Slab
Designing Slab
More like this
Top Reinforcements (Mat Foundation)
Top Reinforcements (Mat Foundation)
More like this