Follow the next steps to define construction of substructure bridge components.

1

Go to Loading/Construction/Superstructure, click Deck.

2

Deck pouring and hardening are the states of deck construction stage and should be specified here.

3

Go to Deck Casting tab.

4

Specify names of the deck construction stages in Name.

5

Select pouring stages in Pouring Stage (Weight Only) and hardening stages in Hardening Stage (Gains Stiffness).


Follow the below steps to copy and paste all inputs from our data set.

1

Go to Deck under Superstructure on the tree view.

2

Copy Deck Casting, Longitudinal and Transverse from model inputs and paste into OpenBrIM.

3

Go to Girder Erection (Complete) under Superstructure on the tree view.

4

Copy Girder Construction from model inputs and paste into OpenBrIM.

5

Go to Superstructure Attachment Construction under Superstructure on the tree view.

6

Copy General from model inputs and paste into OpenBrIM.


 Quick Tip: Copy inputs to OpenBrIM

Copy the desired data with the automatic copy button in the upper left corner.

Click on the first cell in and use the Ctrl+V shortcut to paste.

If icon won’t appear, collapse page tree menu by clicking on arrow or using shortcut “[”.

While pasting large data, it would be handy to turn of Auto-refresh .

Bearing

Superstructure Connection Construction

SCC1	GirderStage	[IP8,IP7,IP6,IP5,IP4,IP3,IP2,IP1,IP12,IP11,IP10,IP9,IP16,IP15,IP14,IP13]

Pier Cap/End Bent (Complete)

Pier Cap Construction

PCC1	SubstrConstStage	[PierCap1,PierCap2]	1

Pier Column

Pier Column Construction

PCC2	SubstrConstStage	[PierColumn1,PierColumn2,PierColumn3,PierColumn4,PierColumn5]	1

Foundation (Complete)

Foundation Construction

FC1	SubstrConstStage	[Footing1,Footing2]	1

Pile

Pile Construction

PC1	SubstrConstStage	[Footing1,Footing2]	[]	1