/
S04: Creep and Shrinkage - Connect Aging Cantilevers

S04: Creep and Shrinkage - Connect Aging Cantilevers

This is a simple stage analysis. The 2 cantilevers are first assembled at day 28 and allowed to age to day 50. At that point, they are made fully connected at the free ends and allowed to age to day 4000. This sample allows us to see how internal forces related to creep displacements are developing over time.


Use CEB-FIP model code 1978 with user-defined time dependent material curves in this sample.

Time dependent stage analysis is performed for all construction stages using maximum of 10 iterations for construction stage.

Related content

S03: Creep and Shrinkage - Use CEB-FIP model code 1990 in S02
S03: Creep and Shrinkage - Use CEB-FIP model code 1990 in S02
More like this
S02: Creep and Shrinkage - Cantilevers Loaded at Different Times
S02: Creep and Shrinkage - Cantilevers Loaded at Different Times
More like this
S07: Composite I-Girder with Time-Dependent Effects
S07: Composite I-Girder with Time-Dependent Effects
More like this
Frame27 – Construction Sequence Loading ✔
Frame27 – Construction Sequence Loading ✔
More like this
Frame29 – Large Bending Displacements
Frame29 – Large Bending Displacements
More like this
Frame02 - Temperature Loading✔!
Frame02 - Temperature Loading✔!
More like this