After clicking on 'Superstructure> Connections> Shear Stud' in the navigation treeview, follow the steps to define the Shear Stud. You can use the collapsed documentation page below for more information on the explanations of each parameter.
1 |
| ||
2 |
| ||
3 |
| ||
4 | Start and End Station parameters of the Shear Stud should take into account skew angle. | ||
5 | |||
6 | You can edit the dimensions of Shear Stud from Shear Stud tab.
| ||
7 | You can enable/disable display the detailing of shear studs by editing Show Studs as in splice spreadsheet. | ||
8 | When the steps are completed, the shared screenshot displayed in the adjacent cell should be visible in the 3D view of OpenBrIM. | ||
9 | To model all the shear studs, copy the data below and paste the parameters into the first cell in OpenBrIM spreadsheet. Refer to the quick tip for an easy guide on how to perform the copy operation. After completing the copy, proceed to the next step to verify the model. |
Shear Stud | |
---|---|
Position SS1 G4 1.9750 73.0000 SS2 G4 74.5917 160.0000 SS3 G4 161.0000 265.0000 SS4 G4 266.0000 370.0000 SS5 G4 371.0000 457.0000 SS6 G4 458.0000 529.0000 SS7 G3 1.9750 73.0000 SS8 G3 74.5917 160.0000 SS9 G3 161.0000 265.0000 SS10 G3 266.0000 370.0000 SS11 G3 371.0000 457.0000 SS12 G3 458.0000 529.0000 SS13 G2 1.9750 73.0000 SS14 G2 74.5917 160.0000 SS15 G2 161.0000 265.0000 SS16 G2 266.0000 370.0000 SS17 G2 371.0000 457.0000 SS18 G2 458.0000 529.0000 SS19 G1 1.9750 73.0000 SS20 G1 74.5917 160.0000 SS21 G1 161.0000 265.0000 SS22 G1 266.0000 370.0000 SS23 G1 371.0000 457.0000 SS24 G1 458.0000 529.0000 | Shear Stud SS1 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS2 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS3 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS4 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS5 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS6 0.8750 5.0000 0.3750 3.0000 4.0000 4.0000 3.0000 YES SS7 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS8 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS9 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS10 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS11 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS12 0.8750 5.0000 0.3750 3.0000 4.0000 4.0000 3.0000 YES SS13 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS14 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS15 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS16 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS17 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS18 0.8750 5.0000 0.3750 3.0000 4.0000 4.0000 3.0000 YES SS19 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS20 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS21 0.8750 5.0000 0.3750 3.0000 4.0000 8.0000 3.0000 YES SS22 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS23 0.8750 5.0000 0.3750 3.0000 4.0000 6.0000 3.0000 YES SS24 0.8750 5.0000 0.3750 3.0000 4.0000 4.0000 3.0000 YES |
The completed shear studs are illustrated below. Please verify that you have the same model on your end by examining each view provided here. For more information on how to perform visual checks, refer to the quick tips.
To view the entire procedure explained on this page, please watch the recorded Video below.
Add Comment