Follow the next steps to define construction of substructure bridge components.
1 | Go to Loading/Construction/Substructure, click Bearing. | |
2 | Select a Stage at Superstructure Connection Construction tab as GirderStage. | |
3 | Pick Insertion Points. | |
4 | Click all the Insertion Points. | |
5 | Click Done. | |
6 | Proceed with Pier Cap/End Bent (Complete). | |
7 | Select a Stage as SubstrConstStage. | |
8 | Pick Pier Caps. | |
9 | Click on PierCap1 and PierCap2. | |
10 | Click Done. | |
11 | Set Self Weight Factor to 1. | |
12 | Proceed with Pier Column. | |
13 | Select a Stage as SubstrConstStage. | |
14 | Pick Columns. | |
15 | Click on all the columns. | |
16 | Click Done. | |
17 | Set Self Weight Factor to 1. | |
18 | Proceed with Foundation (Complete). | |
19 | Select a Stage as SubstrConstStage. | |
20 | Pick Foundation. | |
21 | Click on all the foundations. | |
22 | Click Done. | |
23 | Set Self Weight Factor to 1. | |
24 | Proceed with Pile. | |
25 | Select a Stage as SubstrConstStage. | |
26 | Pick Substructures Above. | |
27 | Click on all the foundations. | |
28 | Click Done. | |
29 | Set Individual Piles as Empty. | |
30 | Set Self Weight Factor to 1. |
Follow the below steps to copy and paste all inputs from our data set.
1 | Go to Bearing under Substructure on the tree view. |
2 | Copy Superstructure Connection Construction from model inputs and paste into OpenBrIM. |
3 | Go to Pier Cap/End Bent (Complete) under Substructure on the tree view. |
4 | Copy Pier Cap Construction from model inputs and paste into OpenBrIM. |
5 | Go to Pier Column under Substructure on the tree view. |
6 | Copy Pier Column Construction from model inputs and paste into OpenBrIM. |
7 | Go to Foundation (Complete) under Substructure on the tree view. |
8 | Copy Foundation Construction from model inputs and paste into OpenBrIM. |
9 | Go to Pile under Substructure on the tree view. |
10 | Copy Pile Construction from model inputs and paste into OpenBrIM. |
Bearing |
---|
Superstructure Connection Construction SCC1 GirderStage [IP8,IP7,IP6,IP5,IP4,IP3,IP2,IP1,IP12,IP11,IP10,IP9,IP16,IP15,IP14,IP13] |
Pier Cap/End Bent (Complete) |
---|
Pier Cap Construction PCC1 SubstrConstStage [PierCap1,PierCap2] 1 |
Pier Column |
---|
Pier Column Construction PCC2 SubstrConstStage [PierColumn1,PierColumn2,PierColumn3,PierColumn4,PierColumn5] 1 |
Foundation (Complete) |
---|
Foundation Construction FC1 SubstrConstStage [Footing1,Footing2] 1 |
Pile |
---|
Pile Construction PC1 SubstrConstStage [Footing1,Footing2] [] 1 |