Please follow the instructions provided below to define construction of substructure bridge components.
1 | Navigate to Loading > Construction > Substructure > Bearing | |
2 | Click three-dots icon on Stage cell and click select. | |
3 | Select "BridgeConst" as stage. | |
4 | Click three-dots icon on Insertion Points cell and click pick. | |
5 | Select all of the Insertion Points that were previously defined from the 3D View. Then click Done. |
Follow the below steps to copy and paste all inputs from our data set.
1 | Navigate to Bearing Construction under Substructure on the tree view. |
2 | Copy Superstructure Connection Construction from model inputs and paste into OpenBrIM. |
Bearing Construction |
---|
Superstructure Connection Construction |
SCC1 BridgeConst [IP1,IP2,IP3,IP4,IP5,IP6,IP11,IP7,IP12,IP13,IP8,IP14,IP15,IP9,IP16,IP10,IP17,IP18,IP25,IP19,IP26,IP20,IP21,IP27,IP22,IP28,IP23,IP24,IP29,IP30,IP31,IP32,IP33,IP34] |
Add Comment