Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

Version 1 Current »

After clicking on 'Reports> Project Inputs' in the navigation treeview, follow the steps to define the Project Inputs. You can use the collapsed documentation page below for more information on the explanations of each parameter.

 Project Inputs
1

🖱️ Click the three-dots icon on the Show Sections Gen. by Lib. Components cell, and then set NO.

2

🖱️ Keep the Wind Load Report as default.

3

After the Project Inputs object is defined, it can be reviewed in the Document section before the analysis and design process. For detailed information, you can refer to the Quick Tip below.

4

 Quick Tip: Learn how to show Document

Click on the arrow button above the Analysis button located in the upper-left corner of the OpenBrIM screen.

Click on the Docs. button on the screen that opens up.

5

🖱️ Click Project Inputs Document icon.

6

🖱️ Switch between the Project Inputs tree view and review the tables.

7

Proceed to the next step to verify the model.

The completed project inputs is illustrated below. Please verify that you have the same model on your end by examining each view provided here. For more information on how to perform visual checks, refer to the quick tips.

To view the entire procedure explained on this page, please watch the recorded Video below.

20231127172310.mp4

  • No labels