General
It is recommended to define one bridge per project in OpenBrIM for optimal performance. However, if a project requires multiple bridges (such as two units sharing the same pier), the user can create additional bridges by creating a new row for each bridge and assigning the appropriate alignment to it.
Alignment: Assign alignment of the bridge (refer to the video at the end of this page to see how set operations can be performed using a spreadsheet).
Bridge Info
The following information is not essential for analysis, design, and modeling purposes, but can be used to store additional details about a bridge project.The definitions made in this section can be used to generate the Soil Boring Log Report. The parameters associated with Bridge Info are as follows:
Structure No:
Station:
Route:
Description:
Section:
Location:
County: