Follow the steps below to set the project settings.
Table 1: Project Settings
1 | Go to Drawing Settings under Project Setting from tree view. | |
2 | Click Import Drawing Template. Select a Template according to your preference from combobox and click import. | |
3 | Go to BDS settings under Drawing Settings from tree view. If you want, you can change the BDS default settings from this spreadsheet. Click the "Load Default Settings" button to restore the changed settings |
Table 2: User Management
1 | Click the "User Management" button to assign other authorized engineers to the project. All the work done by the Engineer you add to the project is registered in the Building Design Suite. | |
2 | You can assign or change the permissions and roles of the Engineer you add to the project. Also you can remove Engineer you added to the project, except Admin. |
Table 3: Revision History
1 | The history of your project is kept in this section. If for some reason you need to go back in history in your project, select the date you want to go. | |
2 | You can share the AEC|BOLT BIM Cloud link of the project on the selected date from the button number 1. | |
3 | It shows which process step has been performed in the project on the date selected from the button number 2. | |
4 | You will return to the project on the selected date from the button number 3. |
Table 4: Qiuck Import
1 | You can quickly import all databases to be displayed in the "Properties" step with the "Quick Import" button. (Currently, we will not use the "Quick import" button and the databases will be imported manually.) |
The “Project Settings” part is completed in this step.