Table 1: General Setting
1 | Click the New Project button, enter a name for your project. Click OK and open a new project. | Verifies New Project Creation(add screenshot) | |
2 | Edit the project description and check if it is saved by opening the project again. | Verifies Open Project & Save | |
3 | Click the Quick Import button in the project spreadsheet, and import all. | Verifies Library Communication and Import From Library | |
4 | Go to Drawing Setting, make sure that a layer is added to each line in the spreadsheet. | Verifies Drawing Setting Import | |
5 | Go to Materials in the tree view, make sure the materials and their values are imported. Make sure there is no inaccurate value. Compare it with screenshot. Click the Add button, create a new material (ex: Test) and change each cell whose values can be changed. Check that the changes are saved. | Verifies Material Import and spreadsheet operations. | |
6 | Go to the rebar in the tree view, make sure the rebars and their values are imported and check there is no inaccurate value. Add rebar, Make sure rebar values like diameter, area, weight can be changed and it is saved | Verifies Rebar Import and spreadsheet operations | |
7 | You have to set the Material of the rebar from spreadsheet combobox. Make sure the material value is saved. | Verifies spreadsheet combobox operation and object | |
8 | Go to Load Class in the tree view. Check if Self-weight is available by default. Click Add and create a new load class. | Verifies default object(self weight) creation, new object creation, combobox enumarations. | |
9 | Go to Load in the tree view. Import specified loads from the load database. Check data on Spreadsheet. | Verifies load database import | |
10 | Click the Add button and create new loads. Change the data of the Load class type and magnitude values and make sure it is saved. | Verifies Add Load | |
11 | Go to Load Combination Table in the tree view. Check the imported data. Click Add, add a manual combination, set limit state and other factors. | Verifies default import and adding custom load combination | |
12 | Click the Linear Combinations button and go to the envelope from the selection box. Click Add to create envelope. Change the cases yes and no parameters. Check if an error occured. | Verifies envelope | |
13 | Go to drawing file click upload drawing. Upload the Drawing file from Attachment to BDS. | Verifies upload operation. |
The General Setting part is completed in this step.
Contents from above have been entered. Project Setting, Draw Setting, Materials, Rebars, Load Classes, Load, Load Combination Table, Drawing Files
Table 2: Stories
1 | Go to Foundation in the tree view. Enter Elevation as -5 feet. It will return to the Foundation step after completed Stories step. | This step is done so that the Elevation (ft) values for each Stories can be entered correctly. | |
2 | Go to Stories in the tree view. Click Add button and add 3 floors. Enter 12-24-36 feet at the elevation of floors. Choose 1st floor for all of them as a similar story. Place the 1st floor a drawing file. | Verifies creation Stories and spreadsheet operation. | |
3 | Click Add button again. "Enter a story no between 0 and 3 to define the story insertion point?" Enter the value 3 in the question. This value entered is the Stories number. New stories to be added will be placed on top of this Stories. | Verifies new stories add to on which stories | |
4 | "How many stories do you want to create?" Enter the value 1 in the question.
| Verifies how many new stories add to on determined stories | |
5 | Copy all the data from the top line to the new added floor, manually enter the elevation value of 48 feet and change New Stories' name. | Verifies the change of data in new stories | |
6 | Go to the 1st floor in Stories. Check that the properties values are correct. | Verifies that values entered in Stories are displayed on 1st floor spreadsheet | |
7 | Call the Drawing file added to the 1st floor to the CAD view by using overlay button. | Verifies Overlay operating | |
8 | Go to the Slab below 1st floor. Draw Slab Edge on CAD view. Enter data as in the screen shoot. | Verifies CAD & 3D view of Slab Edge | |
9 | Click the Refresh Parametric Model button to update the model and check the 3D view. | Verifies Refresh Parametric Model operating | |
10 | |||
11 | Draw Slab Piece on CAD view. Enter data as in the figure. | Verifies CAD & 3D view of Slab Piece | |
12 | |||
13 | Click the Design Strip button. Draw a line for design strip. Click yes for the question "Do you want to create same design strip definition for all stories?". | Verifies the CAD view of design strip | |
14 | Go to Openings below 1st floor. Draw the openings. Have to draw 1 Rectangular, 1 circle, 1 Arbitrary Openings according to CAD view. | Verifies drawing of openings | |
15 | |||
16 | Go to Shearwall below 1st floor. Draw Shearwall by using Shearwall button. Set material value. Check if the hold point can be changed. | Verifies drawing of Shearwall and 3D view | |
17 | |||
18 | Go to the Analytical definition tab. Draw an Analytical wall on CAD view. Make sure that a break point is formed on the horizontal wall. | Verifies drawing of Analytical line on CAD view and break point operation | |
19 | |||
20 | Click the elevation views to see the horizontal view of the Shearwall. Click on the wall opening. Have to draw rectangular, circular and arbitrary opening on Shearwall. | Verifies shearwall opening in 3 different geometric shapes | |
21 | |||
22 | Go to the Column below 1st floor and draw rectangular column by using rectangular column button. Enter 30° degree orientation angle. | Verifies drawing of Rectangular column and spreadsheet operation | |
23 | Draw a circular column by using circular column button. Enter the bottom offset X=10 inch and Y=20 inch | Verifies drawing of Circular column and spreadsheet operation | |
24 | Click the Arbitrary Column button, draw an Arbitrary column. Change the Hold point of column C2. Enter an orientation angle of 45° and 60° degrees in C1 and C2 columns You can enter remaining cells based on the figure. | Verifies drawing of Arbitrary column and spreadsheet operation | |
25 | Click the Show Tributary button. Check if tributary area of each column is the same or similar to the figure given. | Verifies Tributary operation for column | |
26 | Go to Beam below 1st floor. Click draw beam button and draw the beam between 2 arbitrary columns. Enter the Material class="Conc 4000psi" and Depth="24 inch" values into the cell. | Verifies drawing of beam | |
27 | Go to the analytical line and draw the analytical line. Enter the width and depth values. Manually enter the break point right in the middle on beam | Verifies drawing of beam Analytical line and add breakpoint | |
28 | Click the Show Tributary button. Check the tributary area of the beam. | Verifies Tributary operation for Beam | |
29 | |||
30 | Analytical beam supports will be added after necessary edits | ||
31 | Go to Load below 1st floor. Click area button and draw the area in the CAD view Have to select Load case for these these loads according to figure | Verifies define loads and select load case | |
32 | |||
33 | After all the values are entered in the cells, click the Refresh Load Distribution Factors button. Make sure the Geometric Distribution To column % value is 100%. | Verifies refresh load distribution factors operating | |
34 | The 100% value could not be captured in this figure, but it will be corrected. | ||
35 | Go back to the 1st floor. Click the Update similar stories button. Select all checkbox on the left side of the table. Select the 2nd floor checkbox on the right. Click the Update similar stories button. As seen in the figure, number of objects selected is written left side under Update Similar Stories button. | Verifies Update Similar Stories operating Verifies that all objects have been copied from 1st floor to 2nd floor and 3D view is correct. | |
36 | |||
37 | Go to the 3rd floor and click Copy From button. Select all the checkbox in the Select objects to copy section. Select 1st floor in Select a source story. Click the copy all button. | Verify Copy From operation Verifies that all objects have been copied from 1st floor to 3rd floor and 3D view is correct. | |
38 | |||
39 | Go to the Roof and click the Copy From. Select object to copy tab. Select Slabs, Openings, Columns objects. Select 1st floor as the source story and click the Select Graphically button. Select the objects from the drawing and click enter. Check if only selected objects are present in the overlay drawing. | Verified manually selecting copy object by Copy From | |
40 | |||
41 | Go to the 1st Floor click the Select Update Similar Stories tab. Select Shearwall, Load and beam objects at checkbox. Select Roof as "Select Stories to Paste" and click the Select in CAD button. Select the objects from the drawing and click enter. | Verified manually selecting copy object by Update Similar Stories | |
42 |
The Stories part is completed in this step. You should have 4 identical floor layer in your project.
Contents from above have been entered. Stories; Slab, Openings, Loads, Columns, Shearwalls, Beams
Table 3: Foundation
1 | Go to Foundation in the tree view. Enter Elevation feet -5 feet. | Verifies Foundation elevation operation | |
2 | Go to the Mat below Foundation and click the Mat. Draw the Mat Edge between columns on CAD view. Enter values in the figure for blank cell | Verifies Mat Edge operation | |
3 | |||
4 | Draw the Mat Piece for the Shear-Wall on CAD view. Enter values in the figure for blank cell | Verifies Mat Piece operation | |
5 | |||
6 | Go to the Pile caps below Foundation and click the Template. | Verifies Import pile caps Database It gives the properties of the selected templates on the right side of Database. | |
7 | Enter the values in the table for the material and rebar values. | Verifies template values that can change. | |
8 | Go to Pile Caps below Foundation, click Assign Pile Cap Template. Select the Circular column as the object, click enter. Set to Pile Template to P8 [40] and Pile Embedment Soil value 60 inch. | Verifies Pile Cap Assign | |
9 | |||
10 | Click Pile Cap Edge button under Custom in Pile Cap. | Verifies creation custom pile caps and adjustment pile coordinates | |
11 | Adjust custom Pile caps name (ex: Pile Cap Test). Set to Pile Embedment Soil value 60 inch. Also check to Pile Template. | Verifies Custom pile caps spreadsheet operations | |
12 | |||
13 | Pile Cap Piece part will be shared after necessary arrangements are made. | ||
14 | Go to the Footing below foundation and click the Import footing. Check the imported values and define the Concrete Materials class. | Verifies Import Footing Template | |
15 | This section will be updated again as the Footing templates cannot be applied to the Arbitrary column yet. | ||
16 | Go to Custom below Footing and click Add. Set width and depth values according the figure. | Verifies Custom footing spreadsheet operation | |
17 | Go to the Footing and click the Add Footing button. Select C2 arbitrary column on CAD view. | Verifies set Custom footing | |
18 | |||
19 | Go to the Footing and click the Add Footing button. Select C4 rectangular column on CAD view. Set imported template (F_60) to Footing Template. | Verifies set Templates footing | |
20 | |||
21 | If the drawing file is not overlayed, overlay the drawing file for Foundation. Go to the Foundation-Wall and click the Foundation-Wall button. Enter values in the figure into the blank cells. | Verifies Foundation Wall operation | |
22 | |||
23 | Foundation Wall Break Points UI button description will be updated after certain edits. | ||
24 | Go to Foundation Loads. Click the Area Load button. Draw an area load in Custom Footing. Have to set Load case for all Loads according to figure | Verifies Foundation Loads operating | |
25 |
The Foundation part is completed in this step.
Contents from above have been entered. Mat, Pile Caps, Footings, Foundation Walls, Foundation Loads.
3D modeling is finished in this Section. Continue to Analysis Section.