nameQuantity Takeoff

General

Based on the unit price data provided by the user, the total cost will be presented according to the project specifications.

Bridge: Specifythe bridge.

Girder Steel Price ($/ton): This parameter can be used to specify the price of steel per ton.

Girder Concrete Price ($/yd3yd³): This parameter can be used to specify the price of girder concrete per cubic yard.

Deck Concrete Price ($/yd3yd³): This parameter can be used to specify the price of deck concrete per cubic yard.

Substructure Concrete Price ($/yd3yd³): This parameter can be used to specify the price of substructure concrete per cubic yard.

Barrier Price ($/ft): This parameter can be used to specify the price of the barrier per foot.

Bolt Price ($/bolt): This parameter can be used to specify the price of bolts per unit.

Stud Price ($/stud): This parameter can be used to specify the price of studs per unit.

Info

Quantity Takeoff Report Includes

  1. Cost Breakdown per Component (Graphical Representation)

  • A visual representation of the cost distribution across components.

image-20241122-120552.pngImage Added

2. Tables for Each Defined Component

  • Detailed tables listing quantities and corresponding prices for each component.