Quantity Takeoff [SIG]

Quantity Takeoff [SIG]

General

Based on the unit price data provided by the user, the total cost will be presented according to the project specifications.

Bridge: Specify the bridge.

Girder Steel Price ($/ton): This parameter can be used to specify the price of steel per ton.

Girder Concrete Price ($/yd³): This parameter can be used to specify the price of girder concrete per cubic yard.

Deck Concrete Price ($/yd³): This parameter can be used to specify the price of deck concrete per cubic yard.

Substructure Concrete Price ($/yd³): This parameter can be used to specify the price of substructure concrete per cubic yard.

Barrier Price ($/ft): This parameter can be used to specify the price of the barrier per foot.

Bolt Price ($/bolt): This parameter can be used to specify the price of bolts per unit.

Stud Price ($/stud): This parameter can be used to specify the price of studs per unit.

Quantity Takeoff Report Includes

  1. Cost Breakdown per Component (Graphical Representation)

  • A visual representation of the cost distribution across components.

image-20241122-120552.png

2. Tables for Each Defined Component

  • Detailed tables listing quantities and corresponding prices for each component.

    image-20241122-120706.png

 

 

 

Related content

Quantity Takeoff
Quantity Takeoff
More like this
Concrete Girder Load Rating [PIG]
Concrete Girder Load Rating [PIG]
More like this
Steel I Girder Load Rating [SIG]
Steel I Girder Load Rating [SIG]
More like this
Concrete Girder Load Rating [PIG]
Concrete Girder Load Rating [PIG]
More like this
Generation of Slab Reinforcement Rectangles [BDS]
Generation of Slab Reinforcement Rectangles [BDS]
More like this
Slab Elevation Table [SIG]
Slab Elevation Table [SIG]
More like this