Quantity Takeoff [SIG]
General
Based on the unit price data provided by the user, the total cost will be presented according to the project specifications.
Bridge: Specify the bridge.
Girder Steel Price ($/ton): This parameter can be used to specify the price of steel per ton.
Girder Concrete Price ($/yd³): This parameter can be used to specify the price of girder concrete per cubic yard.
Deck Concrete Price ($/yd³): This parameter can be used to specify the price of deck concrete per cubic yard.
Substructure Concrete Price ($/yd³): This parameter can be used to specify the price of substructure concrete per cubic yard.
Barrier Price ($/ft): This parameter can be used to specify the price of the barrier per foot.
Bolt Price ($/bolt): This parameter can be used to specify the price of bolts per unit.
Stud Price ($/stud): This parameter can be used to specify the price of studs per unit.
Quantity Takeoff Report Includes
Cost Breakdown per Component (Graphical Representation)
A visual representation of the cost distribution across components.
2. Tables for Each Defined Component
Detailed tables listing quantities and corresponding prices for each component.