Please follow below instructions in order to access ‘Steel Tub Girder Training Example’

1

→ Log in to your account and locate the 'Project' option in the top right corner.

Image Modified
Panel
panelIconId23f3
panelIcon:hourglass_flowing_sand:
panelIconText
bgColor#FFF0B3

Please note that the initial setup process for the user experience take approximately 5-8 seconds to complete. Subsequent interactions will not require as much time.

→ Click on 'Project' and then select 'NEW' from the top left corner of the screen.

Image Modified

2

→ Under the 'Example Project' section, click on 'New Project' specifically located within the 'Steel Tub-Girder Training Example'.

Image ModifiedImage Modified

3

→ Provide a name for your project and proceed to open the example project.

Image ModifiedImage Modified

Panel
panelIconId23f3
panelIcon:hourglass_flowing_sand:
panelIconText
bgColor#FFF0B3

Please note that the initial download process for the library components take approximately 2 minutes and

20

30 seconds to complete.

Subsequent interactions will not require as much time

The reopening of the same project will experience a notable increase in speed, primarily due to the caching of OpenBrIM library objects within your browser. The loading of library objects during this process generally takes less than 2-3 seconds.

Image Modified

View Design Reports of Steel Tub Girder Training Example

Info

Please follow the instructions provided below to initiate steel tub-girder code check reports.

...

In this section, we will examine the code check reports supported by the Steel Tub-Girder Workflow.

  • Steel Tub-Girder Code Check

  • Internal Cross-Frame Code Check

  • Field Splice Code Check

  • Pier Cap Code Check

  • Pier Column Code Check

  • Pier Footing Code Check

  • Pile Capacity Code Check

1

Please ensure that the 'FEM' button located in the top-middle of the screen is active. If the button is inactive, the 'Analysis' button will not appear.

Image Modified

Panel
panelIconId23f3
panelIcon:hourglass_flowing_sand:
panelIconText
bgColor#FFF0B3

Please be aware that the appearance of the analysis button for this project typically takes around 15-20 seconds.

Once the 'Analysis' button appears in the top left corner, it indicates that the FE model has been compiled and is ready for analysis.

Image ModifiedImage Modified

→ Click on it to initiate the finite element analysis (FEA) of the steel tub-girder bridge.

Image Modified

Panel
panelIconId23f3
panelIcon:hourglass_flowing_sand:
panelIconText
bgColor#FFF0B3

Please note that the analysis for this project typically takes around 3.5 minutes to complete.

2

→ Once the analysis is completed, click the "Close" button to exit the analysis interface.

Image Modified

3

→ Proceed by clicking the "Design" button to calculate the parametric design parameters and collect the analysis results required for the design reports.

During the design process, you can track the design progress from the top-middle of the screen.

⚠️ You should keep the design tab visible until the task completes, as hiding or minimizing the page pauses the process of collecting analysis results.

Image ModifiedImage Modified

Panel
panelIconId23f3
panelIcon:hourglass_flowing_sand:
panelIconText
bgColor#FFF0B3

Please be aware that the design verification for this project generally takes approximately 9 minutes to complete.

4

→ After the design run is completed, click on the "OK" button to start viewing the created design reports.

Image Modified

5

→ Clicking on the "Report" and "Detailed Report" buttons successively will display a range of design reports that can be accessed.

Image Modified

→ By

clicking on

selecting the "Detailed Report" option, you

will be able to

can access a

diverse range

variety of design outputs

that provide:
i) specific reports and
ii) code checks

, including quantity reports, camber diagrams, analysis results for the superstructure at ten-foot intervals, code check reports for individual structural elements, and load rating reports.

Image Modified

Tip

The common steps before investigating individual design reports have been completed.

...

...

...

Steel Tub-Girder Code Check Report

Info

Please follow the instructions provided below to create steel tub-girder code check reports.

1

In the summary report, the code checks for the employed girder, code check station, limit state are presented along with the corresponding design check parameters (D/C ratio, Pass/Fail State).

Image Modified
2

Clicking on the "Detailed Report" icon, as illustrated in the previous step, will open a detailed code check report.

Image Modified
3

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Internal Cross-Frame Code Check Report

Info

Please follow the instructions provided below to create cross frame code check reports.

1

In the summary report form, the

resultant

code check values for each chord of the cross frame are presented. Additionally, the summary report format includes gusset plate bolted connection checks.

Image Modified
2

Clicking on the "Detailed Report" icon (marked in red), as illustrated in the previous step, will open a detailed code check report that includes axial force member checks.

Image Modified
3

Clicking on the "Detailed Report" icon (marked in blue) will open a separate report specifically for bolted gusset plate checks.

Image Modified
4

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Field Splice Code Check Report

Info

Please follow the instructions provided below to create field splice code check reports.

1

In the summary report, the code check parameters for the corresponding splices are presented for splice plates and bolts, considering the D/C ratio. These parameters specifically address the strength and service limit states.

Image Modified
2

Clicking on the "Detailed Report" icon, as illustrated in the previous step, will open a detailed code check report.

Image Modified
3

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Pier Cap Code Check Report

Info

Please follow the instructions provided below to create pier cap code check reports.

1

In the summary report, pier cap code checks are conducted using a design templates, namely for AASHTO (marked in red). The report presents the results of these code checks for the pier cap design.

Image Modified
2

Clicking on the "Detailed Report" icon (marked in red), as illustrated in the previous step, will open a detailed code check report that includes pier cap code checks for flexure, shear, torsion, fatigue and reinforcement limits.

Image Modified
3

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Pier Column Code Check Report

Info

Please follow the instructions provided below to create pier column code check reports.

1

In the summary report, the pier column code check presents the results of code checks as either D/C ratios or in Pass/Fail form, accordingly.

Image Modified
2

Clicking on the "Detailed Report" icon, as illustrated in the previous step, will open a detailed code check report that includes pier column code checks for axial force-moment interaction, axial compression, shear, torsion, and reinforcement limits.

Image Modified
3

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Pier Footing Code Check Report

Info

Please follow the instructions provided below to create pier footing code check reports.

1

The summary report for pier footing code check includes D/C values and Pass/Fail status for flexure, one-way shear, two-way shear, and reinforcement limits.

Image Modified
2

Clicking on the "Detailed Report" icon, as illustrated in the previous step, will open a detailed code check report that includes pier footing code checks.

Image Modified
3

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Pile Capacity Code Check Report

Info

Please follow the instructions provided below to create pile capacity code check reports.

1

The summary report for pile capacity code check reports the maximum D/C value against the specified pile capacity.

Image Modified
2

Clicking on the "Detailed Report" icon, as illustrated in the previous step, will open a detailed code check report that includes the most critical results, as well as all the results from different limit states.

Image Modified

3

(lightbulb) Quick Tips - Exploring Design Variables in Depth:

Panel
panelIconIdatlassian-light_bulb_on
panelIcon:light_bulb_on:
panelIconText:light_bulb_on:
bgColor#FFF0B3

Quick Tips - Exploring Design Variables in Depth

...