Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info

Please follow the instructions provided below to define the reference support lines where the piers Piers/Bents will be located.

1

Navigate to Bridge Geometry > Support Lines

 Image Added

 

2

To create the support line at Station 0 ft for the Bridge,

Click on the three-dot icon located on the first cell of the Bridge and set it to "Bridge1".

3

Follow the same process to create the support lines for the remaining structures at their respective stations.

Set the support line for Pier1 at Station 150 ft, Pier2 at Station 300 ft, and Abut2 at Station 450 ft.

 

 

Image Added
4

Define the skew angle of the support line as in the figure

The support lines that have been established thus far are designated for the locations of End Bent and Pier CAP. Now, proceed to input the necessary locations for "Temporary Support" in order to sequentially assembly the Girder Segments.

Image Added

5

Please enter the names and stations of all Temporary Supports as depicted in the figure.

6

The support lines do not exhibit any Skew Angles and Transverse Offset

Image Added

Expand
titleQuick Tip: Transverse Offset Direction

...

Insert excerpt
_ConfluenceInclusions
_ConfluenceInclusions
nameCopyPaste
nopaneltrue

Navigate to Support Lines under Bridge Geometry.

Copy Bridge Parameters from model inputs and paste into OpenBrIM.

...

Tip

Completed Support Lines are illustrated below.

...

Insert excerpt
_ConfluenceInclusions
_ConfluenceInclusions
namePasteTip
nopaneltrue

...

Support Lines

Bridge Parameters

Code Block
languagexml
SL1	BRG1	0.00	0.00	0.00
SL2	BRG1	150.00	0.00	0.00
SL3	BRG1	300.00	0.00	0.00
SL4	BRG1	450.00	0.00	0.00
TemporarySup1	BRG1	20.00	0.00	0.00
TemporarySup2	BRG1	99.00	0.00	0.00
TemporarySup3	BRG1	101.00	0.00	0.00
TemporarySup4	BRG1	199.00	0.00	0.00
TemporarySup5	BRG1	201.00	0.00	0.00
TemporarySup6	BRG1	249.00	0.00	0.00
TemporarySup7	BRG1	251.00	0.00	0.00
TemporarySup8	BRG1	349.00	0.00	0.00
TemporarySup9	BRG1	351.00	0.00	0.00
TemporarySup10	BRG1	430.00	0.00	0.00