nameQuantity Takeoff

General

Based on the unit price data provided by the user, the total cost will be presented according to the project specifications.

Bridge: Specifythe bridge.

Steel Price ($/ton): This parameter can be used to specify the price of steel per ton.

Girder Concrete Price ($/yd3yd³): This parameter can be used to specify the price of girder concrete per cubic yard.

Deck Concrete Price ($/yd3yd³): This parameter can be used to specify the price of deck concrete per cubic yard.

Substructure Concrete Price ($/yd3yd³): This parameter can be used to specify the price of substructure concrete per cubic yard.

Barrier Price ($/ft): This parameter can be used to specify the price of the barrier per foot.

Bolt Price ($/bolt): This parameter can be used to specify the price of bolts per unit.

Stud Price ($/stud): This parameter can be used to specify the price of studs per unit.