Info |
---|
Follow the next steps to add Stories to the BDS project. |
Table 1: Stories
1 | Go to Stories from tree view. Click Add button and adding “1” floors. Enter 12 feet at the elevation of floor. | |
2 | Enter Story Height value and Defult Materials Type data. | |
3 | Set the previously uploaded drawing file to 1st Floor. |
...
1 | Go to Shearwall under 1st Floor from tree view. Click the “Draw Beam” button and draw beam while following the overlayed drawing. | ||||||
2 | Enter Depth data of each beam .and set beam type to “Lateral” | ||||||
3 |
| ||||||
4 | Go to Analytical Lines Tab under Beam in spreadsheet. Click “Draw Analytical Beam” button and draw to inside beam. | ||||||
5 | Enter Width data of each Beam Analytical Line. | ||||||
6 |
| ||||||
7 | Go to Beams at samet spreadsheet. Click “Show Tributary” button. This button shows tributary area of the each Beams. | ||||||
8 |
|
...