Follow the next steps to add Stories to the BDS project.

Table 1: Stories

1

Go to Stories from tree view.

Click Add button and adding “1” floors. Enter 12 feet at the elevation of floor.

2

Enter Story Height value and Defult Materials Type data.

3

Set the previously uploaded drawing file to 1st Floor.

...

Table 3: 1st Floor Column

1

Go to Column under 1st Floor below Stories from tree view.

Draw the by following the overlayed drawing on the CAD side .Draw following overlayed drawing on the CAD side using “Rectangular Column” button.

2
Expand
titleCAD view

3

Should set Vertical Rebar and Stirrup Rebar for each column in the column spreadsheet.

Image Added

4Image Added

...

Table 4: Openings

1

Go to Openings under 1st floor from tree view.

Click the “Rectangular” button and draw opening while following the overlayed drawing.

Image Added

2

If you find that a data has been entered incorrectly in the Spreadsheet, you can double-click to enter the desired data.

Image Added

3Image Added

...

Table 5: Shearwall

1

2