Tip |
---|
The Stories part is completed in this step. You should have 4 identical layers floor layer in your project. Contents from above have been entered. Stories; Slab, Openings, Loads, Columns, Shearwalls, Beams |
...
1 | Go to Foundation in the tree view. Enter Elevation feet -5 feet. |
| ||||||
2 | Go to the Mat below Foundation and click the Mat. Draw the Mat Edge between columns on CAD view. Enter values in the figure for blank cell |
| ||||||
3 |
| |||||||
4 | Draw the Mat Piece for the Shear-Wall on CAD view. Enter values in the figure for blank cell |
| ||||||
5 |
| |||||||
6 | Go to the Pile caps below Foundation and click the Template. |
| ||||||
7 | Enter the values in the table for the material and rebar values. |
| ||||||
8 | Go to Pile Caps below Foundation, click Assign Pile Cap Template. Select the Circular column as the object, click enter. Set to Pile Template to P8 [40] and Pile Embedment Soil value 60 inch. |
| ||||||
9 |
| |||||||
10 | Click Pile Cap Edge button under Custom in Pile Cap. |
| ||||||
11 | Adjust custom Pile caps name (ex: Pile Cap Test). Set to Pile Embedment Soil value 60 inch. Also check to Pile Template. |
| ||||||
12 |
| |||||||
13 |
| |||||||
14 | Go to the Footing below foundation and click the Import footing. Check the imported values and define the Concrete Materials class. |
| ||||||
15 |
| |||||||
16 | Go to Custom below Footing and click Add. Set width and depth values according the figure. |
| ||||||
17 | Go to the Footing and click the Add Footing button. Select C2 arbitrary column on CAD view. |
| ||||||
18 |
| |||||||
19 | Go to the Footing and click the Add Footing button. Select C4 rectangular column on CAD view. Set imported template (F_60) to Footing Template. |
| ||||||
20 | ||||||||
21 | If the drawing file is not overlayed, overlay the drawing file for Foundation. Go to the Foundation-Wall and click the Foundation-Wall button. Enter values in the figure into the blank cells. |
| ||||||
2022 |
| |||||||
2123 |
| |||||||
2224 | Go to Foundation Loads. Click the Area Load button. Draw an area load in Custom Footing. Have to set Load case for all Loads according to figure |
| ||||||
2325 |
|
Tip |
---|
The Foundation part is completed in this step. Contents from above have been entered. Mat, Pile Caps, Footings, Foundation Walls, Foundation Loads., 3D modeling is finished in this Section. Continue to Analysis Section. |
...