Please follow the instructions provided below to define construction of substructure bridge components.

1

Navigate to Loading > Construction > Substructre > Pile.

2

Click three-dots icon on Stage cell and click select.

3

Select "SubstrConstStage" as stage.

4

Click three-dots icon on Substructures Above cell and click pick.

5

Select all of the Substructures Above (Foundation) that were previously defined from the 3D View.

Figure will be added

6

Then click Done.


Follow the below steps to copy and paste all inputs from our data set.

1

Go to Pile under Substructure on the tree view.

2

Copy Pile Construction from model inputs and paste into OpenBrIM.


 Quick Tip: Copy inputs to OpenBrIM

Copy the desired data with the automatic copy button in the upper left corner.

Click on the first cell in and use the Ctrl+V shortcut to paste.

If icon won’t appear, collapse page tree menu by clicking on arrow or using shortcut “[”.

While pasting large data, it would be handy to turn of Auto-refresh .

Pile

Pile Construction

PC3	SubstrConstStage	[RF1,RF2,F1]	[]	1