Foundation Partial Construction
If a footing is built in two connected stages, such as the first stage being associated with an existing structure constructed 20 years ago and the second stage involving the addition of a new part to the footing for a rehabilitation project, this object can be used to simulate the behavior. If the footings are not connected, two separate footings can be constructed in two different stages.
Stage: Choose the stage for constructing the footings.
Foundation: Choose the footings for construction.
Start Station [From Right]: When determining stations in the direction of PGL, starting from the right, specify the start station of the foundation to be constructed.
End Station [From Right]: When determining stations in the direction of PGL, starting from the right, specify the end station of the foundation to be constructed.
Self Weight Factor: Indicate the self-weight factor, which is calculated using the material's unit weight and the object's volume, typically set to 1.
Add Comment