Pile Construction [SIG]
Pile Construction
Stage: Choose the stage for constructing the piers. Usually, the construction of pier caps, piers, footings, and piles is completed within a single stage.
All Piles Under Substructure: Users can conveniently select connected substructure elements instead of individually choosing piles. The library component automatically identifies and constructs the connected piles.
Individual Piles: Select the piles for construction. There is no need to reselect piles under substructures if the "All piles under substructure" parameter is used.
Self-Weight Factor: The Self-Weight Factor is a parameter used to adjust the contribution of an object's own weight in structural analysis. This factor is particularly useful in simulations, as it enables the scaling or modification of the self-weight during finite element analysis (FEA).