Gravity Beam Code Check For Training Example 1

Beam Name

Shear

Torsion

Flexure

Design State

Critical Combination

Station

D/C

Critical Combination

Station

D/C

Critical Combination

Station

D/C

D/C

AB 8 (2nd Floor)

1.2D + 1.6L

0

0.221

1.2D + 1.6L

0

0.2837

1.2D + 1.6L

0.5

0.42

0.42

AB 3 (2nd Floor)

1.2D + 1.6L

0.97

0.4285

1.2D + 1.6L

0.97

0.2837

1.2D + 1.6L

0.58

0.7304

0.73