Staged Based Analysis is one of the analyses that can be performed using OpenBrIM.
To conduct this analysis, it is vital to define the construction stages and assign the construction or deconstruction of the related bridge elements to those stages.
For a detailed description of each section related to this part of the workflow, refer to the documentation on the corresponding page.
0 Comments