Please follow the instructions provided below to create Pile Capacity check
1 | To check the capacity of the Piles in this section, select the appropriate Pile Cap for the corresponding pile. If the goal is to assess the strength of all substructure elements supported by piles, six distinct pile capacities need to be defined. | |
2 | Navigate to Substructure Code Checks > Pile Capacity Check | |
3 | Enter the Pile Capacity Code Check name as in the figure | |
4 | Click three-dots icon on Template and assign “PileCapacityCCT” all code checks | |
5 | Click three-dots icon on Pile Cap and click pick. | |
6 | In the 3D view, choose the substructure elements as "Pile Cap” as in the figure. |
Follow the below steps to copy and paste all inputs from our data set.
1 | Navigate to Pile Capacity Check under Superstructure Code Checks on the tree view. |
2 | Copy General from model inputs and paste into OpenBrIM. |
The Pile Capacity Check have been created.
Pile Capacity Check |
---|
General |
PileCapacity1 PileCapacityCCT Pier_1 PileCapacity2 PileCapacityCCT Pier_2 PileCapacity3 PileCapacityCCT Pier_3 PileCapacity4 PileCapacityCCT Pier_4 PileCapacity5 PileCapacityCCT EndBent1 PileCapacity6 PileCapacityCCT EndBent2 |