Superstructure Connection Deconstruction

In some scenarios, loads may need to be transferred to temporary towers. To achieve this, users can deconstruct the bearings at the piers and simultaneously construct them at the temporary tower location.

Stage: Select the stage for deconstructing the bearings.

Insertion Points: Choose the insertion points that represent the bearings.