Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 2 Next »

In this part, some of the critical design procedures below will be performed for the bridge.

  • Substructure code checks

      Pier cap

      Pier column

      Pile cap

      Pile capacity

  • Superstructure code checks

      Steel I girder

      Bolted field splice

      Cross frame

      Shear stud

  • Load Rating

  • Reports

      Steel I girder analysis summary table

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.