Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 2 Current »

Please follow the instructions provided below to create Pile Capacity check template

1

Navigate Templates for Code Check and Load Rating > Pile Capacity Check T

2

It is sufficient to define one Load Combination Table for Pile Capacity check.

 

Enter the name in the Name column as PileCapacityCCT

3

Click three-dots icon on Load Combination Table and assing SubstructureLCT.

 

Since the Pile is a substructure element the appropriate Load Combination Table to assign would be "SubstructureLCT".


Follow the below steps to copy and paste all inputs from our data set.

1

Navigate to Pile Capacity Check T under Templates for Code Check and Load Rating on the tree view.

2

Copy General from model inputs and paste into OpenBrIM.

The Pile Capacity Check have been created.


 Quick Tip: Copy inputs to OpenBrIM

Copy the desired data with the automatic copy button in the upper left corner.

Click on the first cell in and use the Ctrl+V shortcut to paste.

If icon won’t appear, collapse page tree menu by clicking on arrow or using shortcut “[”.

While pasting large data, it would be handy to turn of Auto-refresh .

Pile Capacity Check

General

PileCapacityCCT	SubstructureLCT
  • No labels