Please follow the instructions provided below to create Prestressed I Girder Code Check

1

In this section, you can specify the precast I girders you wish to analyze, along with their strength losses and the relevant code requirements you want to consider for this analysis.

This information is essential for conducting code checks.

2

Navigate Superstructure Code Checks > Prestressed I Girder Code Check

3

Click three-dots icon on Girder and click select

Set as G2 and G12 girders

2 Girders were selected from 2 different spans.
Code control will be made when one of the girder is in the middle of the distance and the other girder is close distance to the support.

4

Click three-dots icon on Code Check Template and assing PIGTemp both of them

 

5

Click three-dots icon on Detailed Calculation Position and click select.

6

Assign data as follows

  • for PIG2 : 0.5L

  • for PIG12 : 0.9L

7

Keep "Number of Code Check Location" parameter constant as defult value.

8

Navigate Loss Calculation Tab

9

Enter parameter values as in the figure

10

Navigate Shear Reinforcement tab.

11

Click three-dots icon on Shear Reinforcement data for PIGCC1 (PIG2) and click select.

12

In this section, we will establish the calculation for shear reinforcement compaction in a manner that is specific to each station. This will be done within the spreadsheet.

13