Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 4 Next »

Follow the next steps to Slab Design

Table 1: Slab Design

1

Go to Slab Design from tree view.

Set Analysis Source to “AECBolt” and “CSISafe”.
By choosing this way, whichever value is more critical in the analysis results, BDS will design according to that result.

2

Go to “Slab Design Template” under General from same spreadsheet.

Set Slab Design Template for 1st floor.

3

Go to 1st Floor under Slab Design.

Set the Design Template to "Slab Design Template -1".

4

Go to Corner Zones under General from same spreadsheet.

Corner zones must be present in order to draw stress lines from Sherwall.


Click "Generate Corner Zone" button. Created by Corner Zone CAD view.

5
 CAD view

6

Go to Stress Lines at same spreadsheet.

Click the "Run Stress Line Generation" button to generate stress lines.

7
 CAD view

8

Based on the analysis results, we may want to delete some stress lines because we don't need them all.

Click “Show Strip Button” and select both direction.

The bottom of the stress lines are covered with analysis results on CAD view.

9
 CAD view

10

Click “Refine Stress Line” button and select direction both.

BDS gives a suggestion as to which of the drawn stress lines are redundant and should be deleted.

And delete selected. This is just suggestion, you can choose less or more lines.

11
 CAD view

12

13

  • No labels