Follow the next steps to define construction of bridge components.
1 | Go to Loading/Construction/Superstructure, click Deck. | |
2 | Deck pouring and hardening are the states of deck construction stage and should be specified here. | |
3 | Go to Deck Casting tab. | |
4 | Specify names of the deck construction stages in Name. | |
5 | Select pouring stages in Pouring Stage (Weight Only) and hardening stages in Hardening Stage (Gains Stiffness). | |
6 | Select the deck to be constructed in the corresponding stage. | |
7 | Go to the Longitudinal tab and specify the stations of deck pouring in the longitudinal direction. | |
8 | Go to the Transverse tab and specify the stations of deck pouring in the transverse direction. This example includes a complete casting sequence. Therefore, Keep the Transverse Const. Type as Complete (as default). | |
9 | From Loading/Construction/Superstructure, click Girder Erection (Complete). | |
10 | Select Stage and Bridge. | |
11 | Proceed with Superstructure Attachment Construction. | |
12 | Name the cell. | |
13 | Select Stage. | |
14 | Go to Superstructure Attachment Elements and click on Pick. | |
15 | Pick the barrier objects from 3D view. Then, click done after selection completed. |
Follow the below steps to copy and paste all inputs from our data set.
1 | Go to Deck under Superstructure on the tree view. |
2 | Copy Deck Casting, Longitudinal and Transverse from model inputs and paste into OpenBrIM. |
3 | Go to Girder Erection (Complete) under Superstructure on the tree view. |
4 | Copy Girder Construction from model inputs and paste into OpenBrIM. |
5 | Go to Superstructure Attachment Construction under Superstructure on the tree view. |
6 | Copy General from model inputs and paste into OpenBrIM. |
Deck | ||
---|---|---|
Deck Casting DeckCasting1 Cast1PourStage Cast123GainStiffStage Deck1 0 0 DeckCasting2 Cast2PourStage Cast123GainStiffStage Deck1 0 0 DeckCasting3 Cast3PourStage Cast123GainStiffStage Deck1 0 0 DeckCasting4 Cast4PourStage Cast45GainStiffStage Deck1 0 0 DeckCasting5 Cast5PourStage Cast45GainStiffStage Deck1 0 0 | Longitudinal DeckCasting1 0 111 DeckCasting2 211 319 DeckCasting3 419 530 DeckCasting4 111 211 DeckCasting5 319 419 | Transverse DeckCasting1 Complete N/A N/A N/A N/A DeckCasting2 Complete N/A N/A N/A N/A DeckCasting3 Complete N/A N/A N/A N/A DeckCasting4 Complete N/A N/A N/A N/A DeckCasting5 Complete N/A N/A N/A N/A |
Girder Erection(Complete) |
---|
Girder Construction GCC1 GirderStage BRG1 |
Superstructure Attachment Construction |
---|
General DW_Barrier FBarrierStage [BR3,BR2] 1 YES |