...
Expand | ||
---|---|---|
| ||
Concrete Pier Cap Code Check [SIG] |
1 |
| |||||||||||
2 | As a result of these operations, an issue will appear on the OpenBrIM screen. This does not necessarily mean that any operation was done incorrectly. The issue will be resolved when the code check template, pier cap section, transverse reinforcement profile, and shear reinforcement profile are defined in the next step. | |||||||||||
3 |
| |||||||||||
4 |
| |||||||||||
5 |
| |||||||||||
6 | 🖱️ Keep Design Section w Rebars (or Tendons) as default. | |||||||||||
67 |
If you have reached this stage and you don't have a section to select, and if you want to use the Import Button, you can refer to the Quick Tip. | 7 | ||||||||||
Insert excerpt | _Quick Tips | _Quick Tips | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
name | ImportSection | |||||||||||
nopanel | true | |||||||||||
8 |
| |||||||||||
9 | 8 | 🖱️ Keep Shear Reinforcement Data as default. | ||||||||||
9 | 🖱️Select Shear Reinforcement Profile as ASTMA615No5. 🖱️Select Shear Reinforcement Material as A615_60. | |||||||||||
10 |
| 11 |
🖱️ Set 2 for No. of Legs of Transverse Shear Reinforcementas 2. | |||||||||
12 |
| |||||||||||
13 | 11 | 🖱️ Keep Check For as default. | ||||||||||
1412 |
| |||||||||||
1513 | To model all the pier cap code check, copy the data below and paste the parameters into the first cell in OpenBrIM spreadsheet. Refer to the quick tip for an easy guide on how to perform the copy operation. After completing the copy, proceed to the next step to verify the model. |
...
Pier Cap Code Check | ||
---|---|---|
General
|
Anchor | ||||
---|---|---|---|---|
|
...
Tip |
---|
To view the entire procedure explained on this page, please watch the recorded Video below. |
...