Click the New Project button, enter a name for your project. Click OK and open a new project.

Tip

Verifies New Project Creation

2

Edit the project description and check if it is saved by opening the project again.

Tip

Verifies Open Project & Save

3

Click the Quick Import button in the project spreadsheet, and import all.

Tip

Verifies Library Communication and Import From Library

4

Go to Drawing Setting from tree view, make sure that a layer is added to each line in the spreadsheet.

Tip

Verifies Drawing Setting Import

5

Go to Materials in the from tree view, make sure the materials and their values are imported. Make sure there is no inaccurate value. Compare it with screenshot.

Click the Add button, create a new material (ex: Test) and change each cell whose values can be changed. Check that the changes are saved.

Tip

Verifies Material Import and spreadsheet operations.

6

Go to the rebar in the from tree view, make sure the rebars and their values are imported and check there is no inaccurate value.

Add rebar, Make sure rebar values like diameter, area, weight can be changed and it is saved

Tip

Verifies Rebar Import and spreadsheet operations

7

You have Have to set the Material of the rebar from spreadsheet combobox. Make sure the material value is saved.

Tip

Verifies spreadsheet combobox operation and object

8

Go to Load Class in the from tree view. Check if Self-weight is available by default.

Click Add and create a new load class.
Change the spreadsheet parameters and make sure the value is saved.

Tip

Verifies default object(self weight) creation, new object creation, combobox enumarations.

9

Go to Load in the from tree view. Import specified loads from the load database.

Check data on Spreadsheet.

Tip

Verifies load database import

10

Click the Add button and create new loads. Change the data of the Load class type and magnitude values and make sure it is saved.

Tip

Verifies Add Load

11

Go to Load Combination Table in the from tree view. Check the imported data.

Click Add, add a manual combination, set limit state and other factors.

Tip

Verifies default import and adding custom load combination

12

Click the Linear Combinations button and go to the envelope from the selection box.

Click Add to create envelope.

Change the cases yes and no parameters. Check if an error occured.

Tip

Verifies envelope

13

Go to drawing file click upload drawing. Upload the Drawing file from Attachment to BDS.

Tip

Verifies upload operation.

...

Table 2: Stories

Image Removed drawing and 3D viewGo to the Analytical definition tab
1

Go to Foundation in the from tree view. Enter Elevation as -5 feet. It will return to the Foundation step after completed Stories step.

Info

This step is done so that the Elevation (ft) values for each Stories can be entered correctly.

2

Go to Stories in the from tree view. Click Add button and add 3 adding “3” floors. Enter 12-24-36 feet at the elevation of floors.

Choose 1st floor for all of them as a similar story. Place the 1st floor a drawing file.

Tip

Verifies creation Add Stories and spreadsheet operation.

3

Click Add button again.

"Enter a story no between 0 and 3 to define the story insertion point?"
Enter the value 3 in the question.

This value entered is the Stories number. New stories to be added will be placed on top of this Stories.

Image Removed

as 3

Image Added
Tip

Verifies new stories add to on which storiesadding additional new story.

4

"How many stories do you want to create?" Enter the value 1 in the question.


Here we check the operation of the add floor button.

Tip

Verifies how many new stories add to on determined stories

5

Copy all the data from the top line to the new added floorstory, manually enter the elevation value of as 48 feet and change New Stories' name to Roof.

Tip

Verifies the change of data in new stories

6

Go to the 1st floor in under Stories from tree view. Check that if the values of the properties values are correct.

Tip

Verifies that values entered in Stories are displayed on 1st floor spreadsheet

7

Call Display the Drawing file added to of the 1st floor to in the CAD view by using overlay button.

Tip

Verifies Overlay operatingAutocad operation

8

Go to the Slab below 1st floor. Slab under Stories from tree view.

Draw Slab Edge on CAD view according to overlay drawing. Enter data as in the screen shootfigure.

Tip

Verifies draw slab edge and CAD & 3D view of Slab Edge

9

Click the Refresh Parametric Model button to update the model and check the 3D view.

Tip

Verifies Refresh Parametric Model operating and 3D view

10
Expand
title3D view

11

Draw Slab Piece on CAD view. Enter data as in the figure.

Click Refresh Parametric Model Button.

Tip

Verifies draw slab piece, CAD & 3D view of Slab Piece and geometric operations.

12
Expand
title3D view

13

Click the Design Strip button. Draw a line for design strip.

Click yes for the question "Do you want to create same design strip definition for all stories?".

Tip

Verifies the CAD view of design strip and draw design strip command.

14

Go to Openings below under 1st floor from tree view. Draw the openings according to overlay drawing.

Have to draw Draw 1 Rectangular, 1 circleCircle, 1 Arbitrary Openings according to CAD Opening as seen in below view. Click Refresh Parametric Model Button.

Tip

Verifies drawing of openingsdraw opening command. CAD & 3D view of Slab Piece and geometric operations.

15
Expand
title3D view

16

Go to Shearwall below 1st floorunder 1st Floor from tree view. Draw Shearwall by using Shearwall button. Set material value. Check if the Click Refresh Parametric Model Button.

Image Added
Tip

Verifies draw opening command. CAD & 3D view of Slab Piece and geometric operations.

17
Expand
title3D view
Image Added

18

Enter value “1” in Hold Point cell.

Check if hold point can be changed of the CAD view.

Image Added

Tip

Verifies

Hold Point of Shearwall

17
Expand
title3D view
Image Removed

18

19
Expand
titleCAD view

Hold Point “1”

Image Added

Hold Point “2”

Image Added

Hold Point “3”

Image Added

Hold Point “4”

Image Added

20

Go to Analytical Definition tab under Shearwall . Draw an Analytical wall on CAD view.

Make sure that a break point is formed on the horizontal wall.

Tip

Verifies drawing of Analytical line on CAD view and break point operation

1921
Expand
titleCAD view

2022

Click the elevation views to see the horizontal view of the Shearwall.

Click on the wall opening. Have to draw rectangular, circular and arbitrary opening on Shearwall.

Tip

Verifies shearwall opening in 3 different geometric shapes

2123
Expand
title3D view

2224

Go to the Column below under 1st floor from tree view and draw rectangular column by using rectangular column button. Enter 30° degree orientation angle.

Tip

Verifies drawing of Rectangular column and spreadsheet operation

2325

Draw a circular column by using circular column button. Enter the bottom offset X=10 inch and Y=20 inch

Tip

Verifies drawing of Circular column and spreadsheet operation

2426

Click the Arbitrary Column button, draw an Arbitrary column. Change the Hold point of column C2. Enter an orientation angle of 45° and 60° degrees in C1 and C2 columns

You can enter remaining cells based on the figure.

Tip

Verifies drawing of Arbitrary column and spreadsheet operation

2527

Click the Show Tributary button. Check if tributary area of each column is the same or similar to the figure given.

Tip

Verifies Tributary operation for column

2628

Go to Beam below under 1st floor from tree view. Click draw beam button and draw the beam between 2 arbitrary columns.

Enter the Material class="Conc 4000psi" and Depth="24 inch" values into the cell.

Tip

Verifies drawing of beam

2729

Click the Beam Type cell to check the drawn beam type.
Check have "Gravity" and "Lateral" options.
Select the "Gravity" button

Tip

Verifies Beam Type operation

2830

Go to the analytical line Analytical Line under Beams and draw the analytical line. Enter the width and depth values. Manually enter the break point right in the middle on beam

Tip

Verifies drawing of beam Analytical line and add breakpoint

2931

Click the Show Tributary button. Check the tributary area of the beam.

Tip

Verifies Tributary operation for Beam

3032
Expand
title3D view

3133
Warning

Analytical beam supports will be added after necessary edits

3234

Go to Load below under 1st floor from tree view. Click area button and draw the area in the CAD view
Click line button and draw the line load in the CAD view.
Click point button create point load in the CAD view

Have to select Load case for these these loads according to figure

Tip

Verifies define loads and select load case

3335
Expand
titleCAD view

Area Load CAD view

Line Load and Point Load CAD view

3436

After all the values are entered in the cells, click the Refresh Load Distribution Factors button. Make sure the Geometric Distribution To column % value is 100%.

Tip

Verifies refresh load distribution factors operating

3537
Warning

The 100% value could not be captured in this figure, but it will be corrected.

3638

Right click on LG1 area load and click duplicate from the window.
You will get a see the duplicated 2nd Load drawn over the LG 1 that uses same area.
Have to set Set Load Case according to the figure below

Tip

Verifies duplicate Load duplicates operation

3739
Expand
titleCAD view

3840

Go back to the 1st floor under Stories. Click the Update similar stories button. Select all checkbox on the left side of the table. Select the 2nd floor checkbox on the right.

Click the Update similar stories button.

As seen in the figure, number of objects selected is written left side under Update Similar Stories button.

Tip

Verifies Update Similar Stories operatingcommand

Tip

Verifies that all objects have been copied from 1st floor to 2nd floor and 3D view is correct.

3941
Expand
title3D view

4042

Go to the 3rd floor and click Copy From button.

Select all the checkbox in the Select objects to copy section. Select 1st floor in Select a source story. Click the copy all button.

Tip

Verify Copy From operation

Tip

Verifies that all objects have been copied from 1st floor to 3rd floor and 3D view is correct.

4143
Expand
title3D view

4244

Go to the Roof and click the Copy From. Select object to copy tab. Select Slabs, Openings, Columns objects.

Select 1st floor as the source story and click the Select Graphically button. Select the objects from the drawing and click enter.

Check if only selected objects are present in the overlay drawing.

Tip

Verified Verifies manually selecting copy object by objects to Copy in Copy From UI

4345
Expand
title3D view

4446

Go to the 1st Floor click the Select Update Similar Stories tab. Select Shearwall, Load and beam objects at checkbox. Select Roof as "Select Stories to Paste" and click the Select in CAD button.

Select the objects from the drawing and click enter.
Check if there are only selected objects in the overlay drawing.

Tip

Verified Verifies manually selecting objects to copy object by in Update Similar Stories UI

4547
Expand
title3D view

Tip

The Stories part is completed in this step. You should have 4 identical floor layer in your project.

Contents from above have been entered. Stories; Slab, Openings, Loads, Columns, Shearwalls, Beams

...

16Go to the Footing and click the Add Footing button
1

Go to Foundation in the tree view. Enter Elevation feet -5 feet.

Tip

Verifies Foundation elevation operation

2

Go to the Mat below under Foundation from tree view and click the Mat.

Draw the Mat Edge between columns under Shearwall on CAD view.

Enter values in the figure for blank cell

Tip

Verifies Mat Edge operation

3
Expand
title3D view

4

Draw the Mat Piece for the Shear-Wall Shearwall on CAD view.

Enter values in the figure for to blank cell

Tip

Verifies Mat Piece operation

5
Expand
title3D view

6

Go to the Pile caps below Foundation Caps under Foundation from tree view and click the Template.
Click Import pile caps button. Check the boxes Select checkbox as in the figure.
(40 Tonne P8-P9-P10-P11-P12) and click import.

Tip

Verifies Import pile caps Database

Tip

It gives the properties of the selected templates on the right side of Database.

7

Enter the values in the table for the material and rebar values.
Check that the values that can be changed can change

Tip

Verifies template values that can change.

8

Go to Pile Caps below under Foundation, click Assign Pile Cap Template. Select the Circular column as the object, click enter.

Set to Pile Template to P8 [40] and Pile Embedment Soil value 60 inch.

Tip

Verifies Pile Cap Assign

9
Expand
title3D view

10

Click Pile Cap Edge button under Custom in Pile Cap.
Draw the pile cap edge. Enter the values in the figure.
Click on show from Show piles. Click on the Pile and assign the Pile to according to figure. Try changing the Pile diameter and cap depth data.

Tip

Verifies creation custom pile caps and adjustment pile coordinates

11

Adjust custom Pile caps name (ex: Pile Cap Test). Set to Pile Embedment Soil value 60 inch.

Also check to Pile Template.

Tip

Verifies Custom pile caps spreadsheet operations

12
Expand
title3D view

13
Warning

Pile Cap Piece part will be shared after necessary arrangements are made.

14

Go to the Footing below foundation and click the Import footingTemplates under Footing from tree view.

Click Import Footing. Check the imported values data and define the Concrete Materials class.

Image Removed
Tip

Verifies Import Footing Template

15
Warning

This section will be updated again as the Footing templates cannot be applied to the Arbitrary column yet.

.

Image Added
Tip

Verifies Import Footing Template

15

Go to Custom below under Footing from tree view and click Add.

Set width and depth values according the figure.

Tip

Verifies Custom footing spreadsheet operation

1716

Go to the Footing and click the Add Footing button. Select C2 arbitrary column on CAD view.

Set “C2 footing” to Footing Template.

Tip

Verifies set Custom footing

1817
Expand
title3D view

1918

Click “Add Footing” again. Select C4 rectangular column on CAD view.

Set imported template (F_60) to Footing Template.

Tip

Verifies set Templates footing

201921

If the drawing file is not overlayed, overlay the drawing file for Foundation. Go to the Foundation-Wall and click the Foundation-Wall button.
Enter Story Number:1 in the command line. Draw a Foundation-Wall so that it goes around the entire perimeter of the building.

Enter values in the figure into the blank cells.

Tip

Verifies Foundation Wall operation

2220
Expand
title3D view

2321
Warning

Foundation Wall Break Points UI button description will be updated after certain edits.

2422

Go to Foundation Loads.

Click the Area Load button. Draw an area load in Custom Footing.
Click on the line load button. Draw line load under Shear-Wall.
Choose the point load button. Add a point load to the rectangular column foundation.

Have to set Load case for all Loads according to figure

Tip

Verifies Foundation Loads operating

2523
Expand
titleCAD view

Tip

The Foundation part is completed in this step.

Contents from above have been entered. Mat, Pile Caps, Footings, Foundation Walls, Foundation Loads.

3D modeling is finished in this Section. Continue to Analysis Section.

...