Floor plan layout and loading plan of 7th floor are shown below. We are going to use following features while modeling on this floor.

→ Slab edge & slab piece

→ Slab opening

→ Copy from & Select GraphicallyCopy All.

→ Arbitrary & rectangular column

→ Show Tributary

→ Shear wall & analytical wall

→ Shear wall opening

→ Beam & analytical beam

→ Area loading & duplicate

→ Line loading

  • Go to 7th Floor → Overlay

  • Select 7th Floor linked drawing

  • Click Ok

Drawing Slab

  • Draw main slab edge polygon using slab edge command as explained before.

  • Draw slab pieces shown on reference drawings using slab piece command as expained before.

  • Enter the thicknesses of slab edge and slab pieces.

  • Enter clear covers of each slab object.

  • Enter elevation offset to slab pieces to adjust global elevations shown in the reference drawings.

  • Update the project.

Drawing Opening

Draw

There are openings

as explained before or you can copy openings which are the same from roof.Image RemovedCopy From” process is the same with copying columns or shear walls.

with the same as roof openings, copy those openings from roof and draw the remaining openings.

  • Go to 7th Floor → Copy from

  • Select Opening objects to copy

  • Select Roof as source story

  • Click Select Graphically

  • Select the same openings

  • Press Enter

  • Go to Openings → Select Rectangular/Arbitrary

  • Draw openings

You can see openings by rotating 3D view after you update the project.

Image Added

Image AddedImage Added

Image Added

Drawing Columns

  • Go to 7th Floor → Overlay

  • Select 6th floor drawing → click OK

Now you see column belows of 7th floor.

  • Draw columns using commands appropriate to the column shape.

You can edit the width and depth or diameter of the columns from spreadsheet. The hold point remain fixed, and other points of the column will be repositioned according to depth and width. You can change the location of hold point from spreadsheet by changing Hold Point number.

You can see tributary areas calculated by AEC | BOLT Building Design Suite as shown below.

  • Click Show Tributary

Drawing Shear Walls

  • Draw shear walls and linked analytical walls

or

You already overlayed one lower floor’s reference drawings to see the columns&shear walls below.

Copy the same

ones

shear walls from above floors

As explained before.

  • Go to 7th Floor → Copy From

  • Select Shear walls object to copy

  • Select Roof as source story

  • Click Select Graphically

  • Update the project

Draw the remaining shear walls

  • Go to Shear Walls

  • Click Shear Wall

  • Draw shear wall

  • Go to Analytical Walls

  • Click Analytical Wall

  • Draw analytical lines

You must draw a straight line from mid point of one edge to mid point of other edge of shear wall. If shear wall is not straight you must draw analytical walls for each directions of shear wall parts.

  • Enter thickness of each analytical wall

Image Added

Image Added

Image Added

We will create an opening on shear wall for a door as shown below.

  • Go to analytical wall which the opening will be drawn

  • Click elevation view

  • Click Wall Opening → select rectangle shape

You must consider point locations on plan and elevation view.

  • Draw a rectangular opening with dimensions above.

  • Click Show Story to go back to plan view.

Drawing Beams

You can copy the same link beams from roof.

  • Go to 7th floor → Copy From

  • Select beams object to copy

  • Select Roof as source story

  • Click Copy All

  • Go to Beams

  • Click Draw Beam and draw remaining beams

You must draw

the beam between vertical support faces.
Image Removed
Image Removed

beams from face of the column or shear wall to face of column or shear wall

  • Enter the depth of the beam to spreadsheet

  • Edit the material property of the beam

  • Select the beam type

Image AddedImage Added

You must draw analytical beams for finite element model.

  • Go to Analytical Lines spreadsheet

  • Click Draw Analytical Beam

  • Draw the analytical beam line

  • Enter the width and depth of the analytical beam

While analytical beam line command is active, joint points shear walls are become visible. Drawing analytical beam lines using these joint will be more accurate for the generation of FE model.

If the line of analytical beam does not pass through the geometric center of the column, a secondary analytical line should be drawn between the column and analytical beam line.

You can start or end the line out of the beam polygon as long as middle point is inside the polygon borders.

When the analytical lines of beams or shear walls intersect, AEC | BOLT Building Design Suite creates break point joint on the intersection point.

Drawing Load Geometry

  • Go to Loads

  • Click Area

  • Draw slab edge polygon

  • Select superimposed dead load value according to the loading schedule as load case

  • Right click on the load in the spreadsheet

  • Click Duplicate

  • Select the live load value according to the loading schedule as load case of clone load are

  • Right click on the load in the spreadsheet

  • Click Duplicate again

  • Select type as line load

  • Select facade value according to the loading schedule as load case

 

Image AddedImage AddedImage Added

Modelling of 7th floor is completed. Updated 3D view is shown below.