Staged-Based Analysis is

...

To conduct this analysis, it is vital to define the construction stages and assign the construction or deconstruction of the related bridge elements to those stages.

...

a crucial analytical feature available in OpenBrIM, designed to simulate and evaluate the structural behavior of bridges throughout their construction phases. This analysis enables engineers to assess how various construction stages impact the overall performance and stability of the bridge.

To effectively conduct Staged-Based Analysis, it is essential to:

  1. Define Construction Stages: Clearly outline each phase of the construction process, identifying the sequence of activities and specific conditions that apply at each stage.

  2. Assign Bridge Elements: For each defined construction stage, assign the relevant bridge elements to either construction or deconstruction. This ensures that the analysis accurately reflects how each element contributes to the bridge's structural integrity during different phases.

By utilizing Staged-Based Analysis, engineers can identify potential issues early in the construction process, optimize design strategies, and enhance the safety and durability of the bridge.

For a comprehensive description of each section related to this part of the workflow, please refer to the corresponding documentation

...