Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Excerpt
namePier Cap/End Bent (Partial)

Pier Cap Construction

If a pier cap is to be partially constructed and the user wants to evaluate the creep and shrinkage effects of each deck pour, they should use this object. However, in most cases, a pier cap is constructed in a single stage, and this can be accomplished using the pier cap/bent (complete) object.

Stage: Choose the stage for constructing the pier or bents.

Pier Caps/Bents: Choose the pier caps or bents for construction.

Cut . Station (From Right): The cut station serves to delineate the boundary of the elements being constructed.

Const. Direction [Left/Right]: The construction direction is utilized to define the area being constructed. If "right" is selected, the area to the right of the cut station will be constructed.

Self Weight Factor: Indicate the self-weight factor, which is calculated using the material's unit weight and the object's volume, typically set to 1.

...