Excerpt | ||
---|---|---|
| ||
Superstructure Connection ConstructionStage:Bearings are usually constructed in conjunction with girders during Choose the stage on which the selected insertion points or bearings will be constructed. Bearings should be constructed in the same stage as the related girders. If they are constructed prior to the girder construction stage. Constructing them with piers may lead to instability issues, as the top node is free to move, instability may occur, leading to failed finite element analysis (FEA). Conversely, if bearings are constructed after the girders, it may result in inaccurate FEA results. Insertion Points: Choose the insertion points that represent the bearings. |
...