Excerpt | ||
---|---|---|
| ||
Pier Cap DeconstructionStage: (optional)Choose the stage for deconstructing the pier or bents. Pier Cap: (optional)Caps: Choose the pier caps or bents for deconstruction. Cut. Station (From Right) [ft]:Cut Direction: (optional): The cut station serves to delineate the boundary of the elements being deconstructed. Const. Direction: The deconstruction direction is utilized to define the area being constructed. If "right" is selected, the area to the right of the cut station will be deconstructed. |
Content Comparison
General
Content
Integrations