Excerpt | ||
---|---|---|
| ||
Foundation Partial ConstructionStage: (optional) Foundation: (optional)If a footing is built in two connected stages, such as the first stage being associated with an existing structure constructed 20 years ago and the second stage involving the addition of a new part to the footing for a rehabilitation project, this object can be used to simulate the behavior. If the footings are not connected, two separate footings can be constructed in two different stages. Stage: Choose the stage for constructing the footings. Foundation: Choose the footings for construction. Start Station [From Right] [ft]:Start - End Station [From Right] [ft]: The station information is utilized to define the constructed section of the footing. Self Weight Factor: Indicate the self-weight factor, which is calculated using the material's unit weight and the object's volume, typically set to 1. |
Content Comparison
General
Content
Integrations