...
1 | Go to Top Reinforcement under 1st Floor from tree view. Click Design Summary and select Column Strip Reinforcement Tab. Click “Generate Reinforcements” button. Reinforcement rectangles and undesign Reinforcement spreadsheet have been created. | ||||||
2 |
| ||||||
3 | Click “Design Reinforcements” button. Rebar, spacing, Count of rebar data can be edited this spreadsheet. Required/Provided intensity cell of each reinforcement region will be green if capacity is enough for demand. If all colors on the spreadsheet are green, the design is complete. AEC|BOLT Building Design Suite will automaticaly calculate Required/Provided reinforcement intensity ratio as you enter rebar information. | ||||||
4 |
| ||||||
5 | When calculating Required Density, it takes the critical one among the AECBolt and Safe analysis results.
| ||||||
6 | 7 | 8Go to “Middle Strip Reinforcement” tab at same spreadsheet. Click “Generate Reinforcements” button and than Click “Design Reinforcement” button. | |||||
7 |
|
Tip |
---|
The Top Reinforcement part is completed in this step. You can proceed to the Bottom Reinforcement section. |