Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

1

Go to Column Design Lines from tree view.

Check that "Column Schedule" has been created in the CAD view.

Tip

Verifies Column Schedule creation

2

Click Verify Selected and select columns in the figure.

Click run code check button and make sure selected column “C4” verified.

Tip

Verifies Verify Selected for Column

3

Click Verify All.

Make sure all column analyzed.

Image Removed

verified.

(Do not define vertical strips for arbitrary columns, cannot see analysis result in CAD view in C1 and C2 column)

Image Added

Tip

Verifies Verify All for Column

4

Click Design Columns from Column Design Lines Spreadsheet.

Image Added

Tip

Verify Design Columns

5
Expand
titleCAD view

Do not define vertical strips for arbitrary columns, cannot see the analysis result in CAD view in C1 and C2 column

5
Tip
6
Tip
7
Tip
8
Tip
9
Tip
10

6

Names

Warning

7

Go to C1 under Column Design Lines from tree view.

Click Column Design Line Data button and select Rebar Templates.

Click Draw Rebars and enter “2”.

Create rebar on each floor for column C1.

Image Added

Tip

Verifies Column Rebars Creation

8
Expand
title3D view and CAD view
Image Added

9

Click “Show Rebars” cell in Longitudinal Rebar for the 1st floor.

Make sure a coordinate table is created. Also set rebar class “#8”

Make same steps for other floors.

Image Added

Tip

Verifies Show Longitidional Rebar and spreadsheet operations

10

Click

Tip

11

Tip

12

Tip

13

Tip

14

Tip

15

Tip

16

Tip

17

Tip

18

Tip

19

Tip

20

Tip

21

Tip

22

Tip

23

Tip

24

Tip

25

Tip

26

Tip

27

Tip

28

Tip