Go to Foundation in the tree view. Enter Elevation feet -5 feet.

Tip

Verifies Foundation elevation operation

2

Go to the Mat below Foundation and click the Mat.

Draw the Mat Edge between columns on Cad view.

Enter values in the figure for blank cell

Tip

Verifies Mat Edge operation

3
Expand
title3D view

4

Draw the Mat Piece for the Shear-Wall on Cad view.

Enter values in the figure for blank cell

Tip

Verifies Mat Piece operation

5
Expand
title3D view

6

Go to the Pile caps below Foundation and click the Template.
Click Import pile caps button. Check the boxes in the figure.
(40 Tonne P8-P9-P10-P11-P12) and click import.

Tip

Verifies Import pile caps Database

Tip

It gives the properties of the selected templates on the right side of Database.

7

Enter the values in the table for the material and rebar values.
Check that the values that can be changed can change

Tip

Verifies template values that can change.

8

Go to Pile Caps below Foundation, click Assign Pile Cap Template. Select the Circular column as the object, click enter.

Set to Pile Template to P8 [40] and Pile Embedment Soil value 60 inch.

Tip

Verifies Pile Cap Assign

9
Expand
title3D view

10

Click Pile Cap Edge button under Custom in Pile Cap.
Draw the pile cap edge. Enter the values in the figure.
Click on show from Show piles. Click on the Pile and assign the Pile to according to figure. Try changing the Pile diameter and cap depth data.

Tip

Verifies creation custom pile caps and adjustment pile coordinates

11

Adjust custom Pile caps name (ex: Pile Cap Test). Set to Pile Embedment Soil value 60 inch.

Also check to Pile Template.

Tip

Verifies Custom pile caps spreadsheet operations

12
Expand
title3D view

13
Warning

Pile Cap Piece part will be shared after necessary arrangements are made.

14
Tip
15
Tip

...

Go to the Footing

...

below foundation and click the Import footing

...

. Check the imported values

...

and define the Concrete Materials class.

...

Image Added
Tip

Verifies Import Footing Template

15
Warning

This section will be updated again as the Footing templates cannot be applied to the Arbitrary column yet.

16

...

Go to Custom

...

below Footing

...

and click Add.

Set

...

width and depth values

...

according the figure.

Name

Image Added

Concrete Material

Rebar

Width (ft)

Depth (ft)

Thickness (ft)

Soil Capacity (tsf)

Rebar Count(X Dir.)

Rebar Count(Y Dir.)

Clear Cover (in)

Outer Rebar Direction

C2 footing

Conc 5000psi

#6

12.00

10.00

10.00

6.00

6

6

3.00

Direction1

...

Tip

Verifies Custom footing spreadsheet operation

17

Go to the Footing

...

and click the Add Footing button. Select C2 arbitrary column on

...

Info

Check 3D view in BDS

...

Cad view

Image Added
Tip

Verifies set Custom footing

18
Expand
title3D view
Image Added

19

If the drawing file is not overlayed, overlay the drawing file for Foundation. Go to the Foundation-Wall

...

and click the Foundation-Wall button.
Enter Story Number:1 in the command line. Draw a Foundation-Wall so that it goes around the entire perimeter of the building.

...

Enter values in the

...

figure into the blank

...

cells.

...

Image Added

Tip

Verifies Foundation Wall operation

20
Expand
title3D view
Image Added

21
Warning

Foundation Wall Break Points UI button description will be updated after certain edits.

22

...

Go to Foundation Loads.

Click the Area Load button. Draw an area load in Custom Footing.
Click on the line load button. Draw line load under Shear-Wall.
Choose the point load button. Add a point load to the rectangular column foundation.

...

Have to set Load case for all Loads according to figure

Image Added

Tip

Verifies Foundation Loads operating


Info