1 | Go to Foundation in the tree view. Enter Elevation feet -5 feet. |
| ||||||||||||||||
2 | Go to the Mat below Foundation and click the Mat. Draw the Mat Edge between columns on Cad view. Enter values in the figure for blank cell |
| ||||||||||||||||
3 |
| |||||||||||||||||
4 | Draw the Mat Piece for the Shear-Wall on Cad view. Enter values in the figure for blank cell |
| ||||||||||||||||
5 |
| |||||||||||||||||
6 | Go to the Pile caps below Foundation and click the Template. |
| 7 |
| 8 | |||||||||||||
Tip | 9 | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Tip | 10 | |||||||||||||||||
Tip | 11 | |||||||||||||||||
Tip | 12 | |||||||||||||||||
Tip |
25. Go to the Pile caps spreadsheet and click the Template button. Click the Import pile caps button. Check the boxes in the screenshot. (40 Tonne P8-P9-P10-P11-P12) and click import.
...
Info |
---|
It gives the properties of the selected templates on the right side of Database. |
...
| ||||||||
7 | Enter the values in the table for the material and rebar values. |
| ||||||
8 | Go to Pile Caps below Foundation, click Assign Pile Cap Template. Select the Circular column as the object, click enter. Set to Pile Template to P8 [40] and Pile Embedment Soil value 60 inch |
| ||||||
9 |
| |||||||
10 |
| |||||||
11 |
| |||||||
12 |
| |||||||
13 |
|
...
...
Info |
---|
Enter the values in the table for the material and rebar values. |
Go to Pile Caps spreadsheet, click Assign pile cap template. Select the Circular column as the object, click enter. Choose one of the templates you imported (P8 [40] )
...